Supertonic Voice Intelligence
Industrial Edge TTS Platform — v3.0
Edge runtime active
31 languages loaded
3 pending alerts
Plant A — Line 4
Floor alerts — real-time voice dispatch
On-device synthesis · No cloud · Purdue Level 2/3 safe
--:--:--
OEE — Line 4
71%
Active alarms
3
Last spoken
—
CRITICAL
Conveyor motor temperature exceeded threshold — Zone 3, Asset C-204
08:14:32 · MES event #4421 · Auto-escalate in 5 min
WARNING
OEE dropped below 75% — Line 4, Shift B
08:22:11 · Ignition tag event · Supervisor notified
INFO
Scheduled maintenance window begins in 30 minutes — Press 7B
08:30:00 · CMMS automated · Planned downtime
Awaiting voice dispatch...
SOP narrator — multilingual work instructions
Reads standard operating procedures aloud · Select worker language
EN
ES
FR
KO
PT
DE
ZH
JA
AUTO
Lockout / Tagout — Press 7B
  1. Notify supervisor and obtain written authorization before starting
  2. Identify all energy sources for Press 7B (electrical, pneumatic, hydraulic)
  3. De-energize by switching main isolator to OFF position
  4. Apply personal padlock to isolator and retain key
  5. Bleed residual pneumatic pressure via relief valve
  6. Verify zero-energy state with approved test instrument
Quality inspector — autonomous defect voice feedback
Vision system flags → spoken defect announcement · Hands-free, eyes-free
Units inspected
248
Defects found
2
Pass rate
99.2%
Surface scratch
MEDIUM
Linear scratch 14mm, orientation 45°
Zone 3 · Camera C-02 · Unit #247
Edge chip
HIGH
Material missing, 3mm × 2mm at top edge
Zone 1 · Camera C-01 · Unit #248
Vision system ready. Click "Simulate scan" to generate defect cards.
Shift briefing — automated handover audio
LLM summarizes last 8 hours → Supertonic reads it during floor walk
ShiftB → C · 07:00 handover
LineLine 4 · Assembly · Plant A
OEE71% (target 85%)
Units produced1,842 of 2,100 planned

KEY EVENTS — LAST 8 HOURS
23:14Conveyor fault C-204 caused 22 min unplanned downtime
01:30Tooling change completed — Press 7B back in service
03:45Material shortage — SKU-B buffer ran to zero for 14 minutes
05:20Quality hold issued — 6 units quarantined, edge chip defect
06:50Line speed reduced 10% pending motor inspection
HMI voice — eyes-busy environment announcements
Welding bays, cleanrooms — no screens needed · Custom message dispatch
Speech rate 1.0×
M1
Deep
M2
Clear
M3
Neutral
F1
Firm
F2
Clear
F3
Neutral
Predictive maintenance — early warning radio
Sensor threshold breach → spoken asset ID + recommended action
Conveyor motor C-204
Vibration · Temp · Current draw
87% degradation · Est. failure: 4 hrs
CRITICAL
Hydraulic pump HP-11
Pressure variance · Flow rate
62% degradation · Est. failure: 2 days
WATCH
Press 7B — Main spindle
Torque · RPM variance
31% degradation · Est. failure: 18 days
NORMAL
Predictive sensor stream active. Click speaker icon to announce asset status.
Voice settings — global platform configuration
Configure TTS engine, OT integration, and deployment parameters
TTS engine
OT / Ignition integration
OT security posture — compliant
LLM/TTS inference confined to Purdue Levels 3–5 · No direct PLC write access · All edge synthesis on-device · Zero cloud egress in air-gapped mode · Compatible with ISA/IEC 62443